Precision Retrofit for Plastic Sheet Production Line

A turnkey controls and motion retrofit improved product consistency, diagnostics, and mechanical reliability on a long-running plastic sheet line.

The Challenge

A plastic sheet production line used one motor and gearbox to drive three output shafts, with no way to adjust the shaft speeds independently. Over time, that limitation contributed to inconsistent sheet thickness, increased scrap, and product issues detected by the quality-control scanner.

Operators also lacked effective troubleshooting tools. The physical configuration added mechanical risk because the output shafts were too far from the gearbox and undersized for the required torque, contributing to strain and reliability problems.

A Complete Turnkey Retrofit

Systems Interface served as the general contractor for the controls retrofit and delivered a coordinated system spanning the control panel, drives, motors, gearboxes, electrical installation, and mechanical integration.

  • A custom control panel designed from the ground up
  • Kinetix 5700 servo drives providing independent, responsive shaft-speed control
  • A compact HMI supporting diagnostics and fine-tuning
  • Prewired gearboxes and servo motors sourced and integrated by Systems Interface
  • Power, Ethernet, and streamlined field wiring

Systems Interface managed the electrical installation, coordinated with the client’s mechanical engineers, and brought in the required fabrication support for a new gearbox frame. The complete system was designed, built, and tested to operate as one integrated retrofit.

The Results

The three shafts can now be controlled independently and kept synchronized from takeoff through cutoff. Operators have greater control of the process and can diagnose and tune the system through the HMI.

  • More consistent product quality through precise speed control
  • Simplified system architecture and streamlined wiring
  • Faster diagnostics and tuning
  • Reduced downtime and improved mechanical reliability