Integrated drive and control systems support the reliable operation of Seattle’s movable South Park Bridge.
King County opened the replacement South Park Bridge over Seattle’s Duwamish Waterway in 2014. Systems Interface designed, manufactured, and commissioned the bridge’s electrical control systems.
Four 100-horsepower motors operate in torque-sharing mode as the primary bridge movers. The control solution includes a Rockwell Automation ControlLogix PLC, PanelView HMI, a custom Allen-Bradley motor control center, and PowerFlex DC drives.
The project applied Systems Interface experience with movable bridges, high-inertia and overhauling loads, and other heavy movable structures. The completed system coordinates bridge movement and provides operators with the control and visibility required for dependable operation.